The 5-Minute Rule for I&e Roofing & Construction
To avoid this, the edge of the starter tile must expand past the drip side. How far? "Starter tiles must overhang the eaves and rake side by inch to inch," claimed https://cyrusptvi761226.gynoblog.com/38175386/getting-the-i-e-roofing-construction-to-work