Penmann successfully delivered a complex HVAC upgrade at Nutricia’s Liverpool facility, supplying a purpose-built ventilation and climate control system engineered to meet stringent hygiene and production criteria. The contract included the complete lifecycle delivery of cutting-edge HVAC systems across non-production, Medium Care (MC) and High Care (HC) areas. Based on https://social40.com/story6180348/penmann-finalises-major-hvac-upgrade-for-nutricia-s-production-facility-in-liverpool-in-line-with-fsi-phase-1-and-2