As viewed through the determine down below, continuous auger is utilized to drill the borehole, elevate up drilled soil, and pour concrete even though the auger is moved up. Because of this, the borehole will not will need casing or hydrostatic pressure to avoid damage to the borehole wall. Traffic https://cast-in-situ-piles-in-dha75073.dgbloggers.com/32995966/the-smart-trick-of-cast-in-situ-piles-that-no-one-is-discussing