As found with the determine below, continuous auger is used to drill the borehole, elevate up drilled soil, and pour concrete while the auger is moved up. Because of this, the borehole doesn't need casing or hydrostatic strain to stop damage to the borehole wall. Now we have structural engineers https://cast-in-situ-piles95025.affiliatblogger.com/84604140/facts-about-cast-in-situ-piles-revealed